CONVERSION OF HEATING BOILER HOUSES IN MINI-THERMAL POWER STATIONS. Part 2

Abstract

The results of feasibility study are given in respect of heat generating plant (co-generating plant) capacity selection on the basis of Gas-Piston Unit for a specific heating boiler house of UE «Minskkommyteploset» in the paper.

Keeping in mind the current situation at the power supply market in theRepublicofBelarusthe most profitable for heat supply enterprises are the variants with application of plants having heating capacity that corresponds to the base load of Hot Water Supply system or having electric power that covers boiler house auxiliaries.

About the Authors

V. A. Sednin
Belarusian National Technical University
Belarus
Doctor of Engineering


A. V. Sednin
Belarusian National Technical University
Belarus
Doctor of Engineering


A. A. Shimoukovich
Belarusian National Technical University
Belarus

Engineer



References

1. Соколов Е. Я. Теплофикация и тепловые сети. – М.: Изд-во МЭИ, 1999. – 472 с.


Review

For citations:


Sednin V.A., Sednin A.V., Shimoukovich A.A. CONVERSION OF HEATING BOILER HOUSES IN MINI-THERMAL POWER STATIONS. Part 2. ENERGETIKA. Proceedings of CIS higher education institutions and power engineering associations. 2005;(6):55-61. (In Russ.)

Views: 567


Creative Commons License
This work is licensed under a Creative Commons Attribution 4.0 License.


ISSN 1029-7448 (Print)
ISSN 2414-0341 (Online)