CONVERSION OF HEATING BOILER HOUSES IN MINI-THERMAL POWER STATIONS. Part 2
Abstract
The results of feasibility study are given in respect of heat generating plant (co-generating plant) capacity selection on the basis of Gas-Piston Unit for a specific heating boiler house of UE «Minskkommyteploset» in the paper.
Keeping in mind the current situation at the power supply market in theRepublicofBelarusthe most profitable for heat supply enterprises are the variants with application of plants having heating capacity that corresponds to the base load of Hot Water Supply system or having electric power that covers boiler house auxiliaries.
About the Authors
V. A. SedninBelarus
Doctor of Engineering
A. V. Sednin
Belarus
Doctor of Engineering
A. A. Shimoukovich
Belarus
Engineer
References
1. Соколов Е. Я. Теплофикация и тепловые сети. – М.: Изд-во МЭИ, 1999. – 472 с.
Review
For citations:
Sednin V.A., Sednin A.V., Shimoukovich A.A. CONVERSION OF HEATING BOILER HOUSES IN MINI-THERMAL POWER STATIONS. Part 2. ENERGETIKA. Proceedings of CIS higher education institutions and power engineering associations. 2005;(6):55-61. (In Russ.)