Experience of Introduction and Operation of Automatic Control Systems of Thyristor Drives in Electrical Part of Steam-Gas Plant Power Block at Station No. 4, Berezovskaya Hydraulic Power Station

Abstract

The paper describes automatic system for controlling the equipment of electrical part of 165 MW which is based on programming controllers and computers.

The proposed system can be applied at operating power stations and the stations which are under construction.

The paper provides results showing introduction of the system at the station No. 4 of the Berezovskaya Hydraulic Power Station in 2004.

Review

For citations:


Senyagine I.V., Naletsky M.M., Zyl Е.N., Kochura S.V. Experience of Introduction and Operation of Automatic Control Systems of Thyristor Drives in Electrical Part of Steam-Gas Plant Power Block at Station No. 4, Berezovskaya Hydraulic Power Station. ENERGETIKA. Proceedings of CIS higher education institutions and power engineering associations. 2007;(1):65-70. (In Russ.)