Selection of Rational Scheme for Inspection of Overhead Power Transmission Lines with 35 kV Voltage and Higher

Abstract

The paper considers four variants of inspection of overhead power transmission lines with 35 kV voltage and higher. Technical and economic indices for every inspection variant have been determined in the paper. The most rational inspection variant of the line having length up to 30 km is a scheme of line inspection by team of electricians within one day. Execution of overhead power transmission line inspection by one person being sent on an assignment trip is expedient when the line length is more than 30 km. In the case of inspection criteria equivalence (minimum cash expenditures on inspection, minimum inspection duration, maximum quality of work execution) a scheme presupposing to use a helicopter with a scanning device is considered as the most rational one.

About the Authors

R. G. Voytko
Belarusian National Technical University
Belarus


M. A. Korotkevich
Belarusian National Technical University
Belarus


References

1. Правила технической эксплуатации электроустановок. – Минскэнерго, 2009. – 325 с.

2. Андриевский, В. Н. Эксплуатация воздушных линий электропередачи / В. Н. Андриевский, А. Т. Голованов, А. С. Зеличенко. – 3-е изд., перераб. и доп. – М. : Энергия, 1976. – 616 с.

3. Фадеева, Г. А. Проектирование распределительных электрических сетей / Г. А. Фадеева, В. Т. Федин. – Минск : Вышэйш. шк., 2009. – 365 с.


Review

For citations:


Voytko R.G., Korotkevich M.A. Selection of Rational Scheme for Inspection of Overhead Power Transmission Lines with 35 kV Voltage and Higher. ENERGETIKA. Proceedings of CIS higher education institutions and power engineering associations. 2012;(2):5-10. (In Russ.)

Views: 616


Creative Commons License
This work is licensed under a Creative Commons Attribution 4.0 License.


ISSN 1029-7448 (Print)
ISSN 2414-0341 (Online)