RISKS OF LOSING CONTROLLABILITY WHILE LIBERALIZING THE ELECTRIC POWER INDUSTRY
Abstract
The paper analyses controllability qua a reliability characteristic of the electric-power grid controlling system. The following notions are used: the object (environment) susceptibility towards the control stimuli, the controlling system adequacy, environment of the secure functioning. The author points to the necessity of accounting for the limitations of technological and organizational character. While liberalizing the electric-power industry, the backbone control-principle “the industry functioning reliability” is being replaced with the principle of “profit-making” that requires complete restatement of the control philosophy.
The conflict between commercial benefit gaining and the reliability assurance expenses leads to losing controllability in all the managerial links and to probable catastrophic consequences. The recapitulation of the Russian Federation power industry privatization substantiates concerns of the liberal ideas poor survivability in the ex-Soviet territories. The results of degradation of the secure-functioning environment demonstrate affinity of the mechanisms that triggered the Chernobyl NPP, Fukusima NPP, and Sayan-Shushenskya HPP disasters. Securing reliability of the strategic objects leaves the competence boundaries of the electricpower industry.
The topical issue of Belorussian electric-power industry functioning and developing is the combination of technical re-equipment (developing the operational dispatch management) and the control-system organizational modernizing in general with gradual and controllable transition to the market mechanisms of functioning. Herewith, preserving the state monopoly on regime provision for the operation of the electric-power system should not leave out the industry appeal for outside investment and is regulated by the optimal degree and intensity of the state participation in governing the electric-power supply industry. The distinction of privatization models and the stages that the countries of the Common Free Market Zone have passed determine Belarus entering the common electric-energy market with limitations at the level of transboundary trade and preservation of the member states internal-commerce structure.
About the Author
Yu. S. PetrushaBelarus
Doctor of Engineering
References
1. Davydov, ?. V. Framework of the Control Theory. Issue-Related Lectures. Elaterinburg: Ural State Mining University. Available at: http://www.prodav.narod.ru/otu/index.html (Accessed 7 February 2014) (in Russian).
2. Lamakin, G. N. (2006) Management Principles in Electric Power Industry. Twer: TSTU [Tver State Technical University]. 208 p. (in Russian).
3. Petrusha, Yu. S. (2013) Automatic Control System of Electric-Power Generation and Marketing under the Conditions of Industry Liberalization. Izvestiya Vysshikh Uchebnykh Zavedenii i Energeticheskikh Ob’Edinenii SNG – Energetika [Proceedings of CIS Higher Education Institutions and Power Engineering Associations – Energetika], 2, 37–42 (in Russian).
4. Gitel’man, L. D., Ratnikov, B. E. (2006) Electric-Power Business. Moscow, Delo Publ. 600 p. (in Russian).
5. Voropai, N. I., Kovalev, G. F., Kucherov, Iu. N. (2013). The Concept of Reliability Assurance in Electric-Power Industry. Moscow, Energia Publ. 212 p. (in Russian).
6. Petrusha, Yu. S. (2014) The UES Functioning and Development Governance. Nauka – Obrazovaniiu, Proizvodstvu, Ekonomike. Materialy 12 Mezhdunarodnoi Nauch.-Tekhn. Konf. T. 1 [Science to Education, Industry, Economics. Proceedings of 12th International Science and Technical Conference. Vol. 1]. Minsk: BNTU, 62–63 (in Russian).
7. TheState Program of Belorussian Energy System Development for the Period to 2016: Approved by the RB Council of Ministers Decree 29.02.2012 No 194. Natsional'nyi Reestr Pravovykh Aktov Respubliki Belarus' [The Republic of Belarus National Registry of Legislative Acts], March 13th 2012, No 5/35381 (in Russian).
8. TheAgreement on Forming the Common Electric-Power Market of the CIS Member States. The Agreement of the RB Government of May 25th 2007. The National Legal Internet Portal of the Republic of Belarus. Available at: http://arc.pravoby.info/dok2007/part3/akt03167. htm (Accessed 17.11.2014) (in Russian).
9. TheAgreement on Access Authorization to Natural Monopolies Services in the Sphere of Electrical Energy Industry Including Principles of Price Formation and Tariff Policy.Natsional'nyi Reestr Pravovykh Aktov Respubliki Belarus' [The Republic of Belarus National Registry of Legislative Acts], January 12th 2011, No 3/2646 (in Russian).
10. Voropay, N. I., Yusifbeyli, N. ?. (2013) Reliability Study Methodological Issues of Large Systems in Energetics. Pub. 63: Reliability Challenges of Energy Systems under Market Conditions. Baku, Azerbaijan Scientific Research and Design Institute of Energy. 566 p. (in Russian).
Review
For citations:
Petrusha Yu.S. RISKS OF LOSING CONTROLLABILITY WHILE LIBERALIZING THE ELECTRIC POWER INDUSTRY. ENERGETIKA. Proceedings of CIS higher education institutions and power engineering associations. 2015;(3):16-24. (In Russ.)