For citations:
Rolik Y.A., Gornostay A.V. Higher Reliability of Electric Power Supply under Wind Electrical Installation Operation in General Power System by Optimization of Their Scheduled Control Period. ENERGETIKA. Proceedings of CIS higher education institutions and power engineering associations. 2010;(3):33-41. (In Russ.)