Preview

Higher Reliability of Electric Power Supply under Wind Electrical Installation Operation in General Power System by Optimization of Their Scheduled Control Period

Abstract

 The paper considers reliability criteria characterizing wind electrical installations (WEI) as restorable systems. It has been shown that the main criterion influencing on reliability of WEI electric supply is a restoration time. Evaluation of restoration time influence on WEI control time has been made in the paper. The paper presents methodology for determination of optimum period  of  WEI control. The optimum period of the scheduled control for WEI of NORDEX-type No.54 has been determined in the paper.

About the Authors

Y. A. Rolik
Transport and Telecommunication Institute
Latvia


A. V. Gornostay
Belarusian National Technical University
Belarus


References

1. Удалов, С. Н. Возобновляемые источники энергии / С. Н. Удалов. – Новосибирск : Изд-во НГТУ, 2007. – 432 с.

2. Roļiks, J. Effect of Wind Conditions of Site Location of Wind Turbine Generators Caused on Profitability of the Commercial Wind Energy projects / J. Roliks // Proceeding of the 8th International Conf. «Reliability and Statistics in Transportation and Communication», October 15–18. – Riga, 2008. – Р. 265–272.

3. Installation of wind Farms in Latvia with BRC 40–500 wind turbines / J. Roliks [et al.] // Proceedings of the International Seminar «Wind energy in Baltic». – Riga : LATVENERGO, 1996. – Р. 36–40.

4. Анищенко, В. А. Надежность систем электроснабжения / В. А. Анищенко. – Минск : Технопринт, 2001. – 160 с.

5. Острейковский, В. А. Теория надежности / В. А. Острейковский. – M. : Высш. шк., 2003. – 463 с.

6. NORDEX N54/1000 kW–Mk3. Service manual. – Nordex Balcke-Dürr GmbH, Svinbaek, Denmark, 1998. – 39 p.

7. NORDEX N54–Mk3. WTG No.: 9154, 9131, 9132. Service Report No.:1–25. – NORDEX Energy GmbH, Rostock, Germany, 1999–2008. – 253 p.


Review

For citations:


Rolik Y.A., Gornostay A.V. Higher Reliability of Electric Power Supply under Wind Electrical Installation Operation in General Power System by Optimization of Their Scheduled Control Period. ENERGETIKA. Proceedings of CIS higher education institutions and power engineering associations. 2010;(3):33-41. (In Russ.)

Views: 698


Creative Commons License
This work is licensed under a Creative Commons Attribution 4.0 License.


ISSN 1029-7448 (Print)
ISSN 2414-0341 (Online)