Determination of Industrial Enterprise Contract Demand Being Part of Maximum Power System Load
Abstract
The paper considers a regime and economic essence of the problem pertaining to determination of the customer contract demand for industrial consumers of electric power with connected load of Sпp > 250 kV×A. A method for determination of the electric power customer half-hour maximum demand is proposed in the paper. The method is based on the calculation of daily average active load and utilization factor with due account of the occurrence probability of a calculated maximum load value.
About the Authors
V. N. RadkevichО. А. Trifonova
References
1. Правила пользования электрической и тепловой энергией. – Минск : Тыдзень, 1996. – 176 с.
2. Гордеев, В. И. Регулирование максимума нагрузки промышленных электрических сетей / В. И. Гордеев. – М. : Энергоатомиздат, 1986. – 184 с.
3. Головкин, П. И. Энергосистема и потребители электрической энергии / П. И. Головкин. – М. : Энергоатомиздат, 1984. – 360 с.
4. Федоров, А. А. Основы электроснабжения промышленных предприятий / А. А. Федоров. – М. : Энергия, 1972. – 416 с.
5. Фурсанов, М. И. Определение и анализ потерь электроэнергии в электрических сетях энергосистем / М. И. Фурсанов. – Минск : УВИЦ при УП «Белэнергосбережение», 2005. – 207 с.
Review
For citations:
Radkevich V.N., Trifonova О.А. Determination of Industrial Enterprise Contract Demand Being Part of Maximum Power System Load. ENERGETIKA. Proceedings of CIS higher education institutions and power engineering associations. 2011;(1):9-11. (In Russ.)