Preview

On the Expediency of Laying Cable Power Lines with a Voltage of 6–35 kV Outside Settlements Instead of Overhead Power Lines

https://doi.org/10.21122/1029-7448-2023-65-5-463-476

Abstract

. It is noted that at present, 10 and 35 kV overhead power transmission lines are being laid outside the settlements of the Republic of Belarus on reinforced concrete vibrated (10 kV) and centrifuged (35 kV) poles that are characterized by low reliability and damaging the environment (on account of alienation of land for poles, the need to make a wide clearing for laying in the forest, obstructions by poles and wires of lines to the operation of agricultural machinery, the danger of electric shock to personnel and the public). It is possible to avoid these disadvantages if, instead of overhead lines, power transmission cables with cables insulated by cross-linked polyethylene are used which are characterized by a very low failure flow parameter. Contrary to the prevailing opinion about the higher cost of cable power transmission lines compared to overhead ones of the same rated voltage, it turned out that, taking into account reliability, the cost of electricity lost in the lines for a year, damage to the environment and to the power system caused by the need to perform more expensive emergency repairs (as compared to a planned one), laying cable lines with three-core and single-core cables of a voltage of 10 and 35 kV instead of overhead cables outside the populated area is fairly justified. In this connection, the laying of three-core cables is more preferable. It should be also borne in mind that with an increase in the length of cable lines, the capacitive earth fault current increases, to compensate for which additional devices are needed to be installed in power centers, viz. arc-extinguishing reactors or resistors, accounting for the cost of which (up to 22 % of the cost of one kilometer of cable line) does not significantly affect the conclusions we have drawn regarding the effectiveness of using 6–35 kV cable power lines in an unpopulated area instead of overhead ones, however.

About the Authors

M. A. Korotkevich
Belаrusian National Technical University
Belarus

Address for correspondence: Korotkevich Mishail А. –
Belarusian National Technical University,
65/2 Nezavisimosty Ave.,
220013, Minsk, Republic of Belarus. 
Tel.: +375 17 292-65-82   
elsyst@tut.by

 


S. I. Podgaisky
Belаrusian National Technical University
Belarus

Minsk



References

1. Rokotyan S. S., Shapiro I. M. [eds.] (1985) Handbook on the Design of Electric Power Systems. Moscow, Energoatomizdat Publ. 352 (in Russian).

2. TKP 339-2011. Electrical Installations for Voltage up to 750 kV. Power Transmission Lines, Overhead and Current Lines, Distribution and Transformer Substations, Electric Power and Battery Installations, Electrical Installations of Residential and Public Buildings. Rules of the Preparation and Protective Measures of Electrical Safety. Electricity Accounting. Norms of Acceptance Tests. Minsk, Ministry of Energy Rep. Belarus, 2011. 594 (in Russian).

3. Baumstein I. A., Bazhanov S. A. [eds.] (1989) Handbook of High Voltage Electrical Installations. Moscow, Energoatomizdat Publ. 768 (in Russian).

4. Cables and Wires. Product Catalog (2017). Vitebsk, Energokomplekt Publ. 117 (in Russian).

5. Fadeeva G. A., Fedin V. T. (2009) Design of Distribution Electrical Networks. Minsk, Vysheishaya shkolva Publ. 365 (in Russian).

6. Fedin V. T., Korol’kov A. V. (2002) Multicriteria Assessment of Environmental Characteristics of Overhead Power Transmission Lines. Minsk, Technoprint Publ. 104 (in Russian).

7. State standard R IEC 60287-1-1-2009. Electrical Cables. Calculation of the Rated Current Load. Part 1-1. Equation for Calculating the Rated Current Load (100% Load Factor) and Calculation of Losses. General Provisions. Moscow, Standartinform Publ., 2009. 25 (in Russian).

8. Gerasimenko A. A., Fedin V. T. (2006) Transmission and Distribution of Electric Energy. Rostov-on-Don, Feniks Publ.; Krasnoyarsk, Izdatel'skie proekty Publ. 720 (in Russian).

9. Sviderskaya O. V. (1993) Conditions for the Formation of Electric Networks Taking into Account Environmental Factors. Minsk, BSPA. 16 (in Russian).

10. Katkov P. A., Frangulyan V. I. (1980) Handbook on the Design of Power Grids in Rural Areas. Moscow, Energiya Publ. 352 (in Russian).

11. Korotkevich M. A. (2014) Operation of Electric Networks. Minsk, Vysheishaya shkolva Publ. 350 (in Russian).

12. Voropai N. I. (2015) Reliability of Power Supply Systems. Novosibrsk, Nauka Publ. 208 (in Russian).

13. Orlov I. N. [ed.] [et al.] (1988) Electrotechnical Reference Book. Vol. 3. Book 1. Production and Distribution of Electric Energy. Moscow, Energoatomizdat Publ. 880 (in Russian).

14. Korotkevich M. A., Podgaiskiy S. I., Golomuzdov A. V. (2017) The Efficacy of the Cables of 6–110 kV with XLPE Insulation. Part 1. Enеrgеtika. Izvestiya Vysshikh Uchebnykh Zavedenii i Energeticheskikh Ob’edinenii SNG = Energetika. Proceedings of CIS Higher Education Institutions and Power Engineering Associations, 60 (5), 417–432 (in Russian). https://doi.org/10.21122/1029-7448-2017-60-5-417-432

15. Korotkevich M. A., Podgaiskiy S. I., Golomuzdov A. V. (2017) The Efficacy of the Cables of 6–110 kW with XLPE Insulation. Part 2. Enеrgеtika. Izvestiya Vysshikh Uchebnykh Zavedenii i Energeticheskikh Ob’edinenii SNG = Energetika. Proceedings of CIS Higher Education Institutions and Power Engineering Associations, 60 (6), 505–522 (in Russian). https://doi.org/10.21122/1029-7448-2017-60-6-505-522


Review

For citations:


Korotkevich M.A., Podgaisky S.I. On the Expediency of Laying Cable Power Lines with a Voltage of 6–35 kV Outside Settlements Instead of Overhead Power Lines. ENERGETIKA. Proceedings of CIS higher education institutions and power engineering associations. 2022;65(5):463-476. (In Russ.) https://doi.org/10.21122/1029-7448-2023-65-5-463-476

Views: 375


Creative Commons License
This work is licensed under a Creative Commons Attribution 4.0 License.


ISSN 1029-7448 (Print)
ISSN 2414-0341 (Online)