Parametric Optimization for Automatic Control System of Power Units of 300 MW for the Mode of Variable Pressure of Turbine Inlet Steam
https://doi.org/10.21122/1029-7448-2018-61-6-539-551
Abstract
The article deals with the problem of parametric optimization of automatic control systems for power units of 300 MW of Lukoml’skaya GRES in the mode of variable pressure of turbine inlet superheated steam. The modernization of automatic power control systems of all power units of Lukoml’skaya GRES was carried out in the nineties of XX century for the last time. At the moment, these systems no longer meet all the requirements of the new standard, which regulates the participation rates of thermal power units in the normalized primary frequency control and in automatic secondary control of frequency and active power flows. According to this standard, the time to achieve the half value of the required power change should be 10 seconds within the normal and emergency reserves; the time to achieve the full value of the required power change should be 30 seconds within the normal reserve and 2 minutes within the emergency one. The construction of the Belarusian NPP is also being completed; its first unit will be put into operation in 2019, and the second one–in 2020. After the launch of the NPP, the Lukoml’skaya GRES power units will be necessitated to operate in a wide range of load changes. It is for these reasons that it is necessary to improve the efficiency of power units in particular and of the entire power plant in general. This can be achieved with the help of the outlined method of parametric optimization of a typical system of automatic control of power units, which allows improving the quality of control of turbine inlet steam power and pressure. The results of computer simulation of transient processes in the system illustrate the technique described in this article and confirm its correctness and undoubted advantages over other methods of optimization of typical systems of automatic control of power units.
About the Authors
G. T. KulakovBelarus
Address for correspondence: Kulakov Gennady T. – Belаrusian National Technical University, 65/2 Nezavisimosty Ave., 220013, Minsk, Republic of Belarus. Tel.: +375 17 293-91-45 tes_bntu@tut.by
A. T. Kulakov
Belarus
K. I. Artsiomenka
Belarus
References
1. Kulakov G. T., Tereshko M. N., Litvinets V. I., Volnyanko M. G., Pirogov V. G., Kurilin L. A., Manuilov V. K. (1979) Power Unit Regulating System. USSR Author’s Certificate No 657179 (in Russian).
2. Terezov Yu. M., Kulakov G. T., Gurenko V. V. (1981) Method for Automatic Control of Active Power Flows and Frequency of Power Pool System. USSR Author’s Certificate No 864427 (in Russian).
3. Terezov Yu. M., Kulakov G. T., Plakhov L. M., Litvinets V. I. (1981) Device for Automatic Power Flow Control between Two Parts of Power Pool System. USSR Author’s Certificate No 864426 (in Russian).
4. Kulakov G. T., Moskalenko A. A., Kostiv I. Yu., Molotkov N. V. (1981) Power Unit Automatic Regulating System of Capacity. USSR Author’s Certificate No 877091 (in Russian).
5. Kulakov G. T., Moskalenko A. A., Kachan A. D. (1983) Thermal Power Unit Group Automatic Regulating System of Capacity. USSR Author’s Certificate No 1053221 (in Russian).
6. Kulakov G. T., Kostiv I. Yu. (1981) Power Unit Control Method for Emergency Running of Power System. USSR Author’s Certificate No 881356 (in Russian).
7. Davydov N. I., Malamed A. D., Trakhtenberg M. D., Fotin L. P. (1979) The System of Automatic Regulation of Frequency and Power of Block-Type Thermal Power Plants with StraightThrough Boilers. Teploenergetika = Thermal Engineering, (8), 2–6 (in Russian).
8. Litvinets V. I., Kulakov G. T., Molev V. V., Red'ko I. I., Polishchuk S. I. (1980) Automatic Control System of Power Unit with Supercritical Parameters. Energetika. Izvestiya Vysshikh Uchebnykh Zavedenii. [Energetika. Proceedings of CIS Higher Education Institutions.], (8), 40–45 (in Russian).
9. Kulakov G. T. (1984) Experimental Determination and Analysis of Dynamic Properties for 300 MW Power Units. Energomashinostroenie [Power Plant Engineering], (1), 9–11 (in Russian).
10. Davydov N. I. (2006) System of Automatic Control of Power of Steam Boiler-Turbine Power Unit. Russian Federation Patent No 2315871 (in Russian).
11. Zorchenko N. V., Davydov N. I., Grigorenko A. A. (2006). Investigating the Effect of Forcing Signals in a System for Automatically Controlling the Output of a Power Unit on its Pickup Capability. Thermal Engineering, 53 (10), 810–818. https://doi.org/10.1134/s0040601506100107.
12. Bilenko V. A., Melamed A. D., Mikushevich E. E., Nikol'skii D. Y., Rogachev R. L., Romanov N. A. (2008) Development and Application of Automatic Frequency and Power Control Systems for Large Power Units. Thermal Engineering, 55 (10), 824–837. https://doi.org/10.1134/s0040601508100030.
13. Company Standard 59012820.27.100.002–2013. Participation Norm of Thermal Power Plants Power Generator Units in Standard Primary Frequency Control and Automatic Secondary Frequency Control and Active Power Flows Control. Moscow, ??? “SO EES”, 2013. 36 (in Russian).
14. Kulakov G. T., Kulakov A. T., Kravchenko V. V., Kuchorenko A. N., Artsiomenka K. I., Kovrigo Yu. M., Golinko I. M., Bagan T. G., Bunke A. S. (2017) Automatic Control Theory for Heat and Power Processes. Minsk, Vysheishaya Shkola Publ. 238 (in Russian).
15. Kulakov G. T. (1984) Engineering Proximate Methods of Design Calculation for Industrial Regulating Systems. Minsk, Vysheishaya Shkola Publ. 192 (in Russian).
16. Kulakov G. T., Kulakov A. T., Artsiomenka K. I. (2018) Parametric Optimization for Automatic Control System of 300 MW Power Units at a Constant Steam Pressure Upstream of the Turbine. Energetika. Izvestiya Vysshikh Uchebnykh Zavedenii i Energeticheskikh Ob’edenenii SNG = Energetika. Proceedings of the CIS Higher Educational Institutions and Power Engineering Associations, 61 (5), 451–462 (in Russian). https://doi.org/10.21122/1029-7448-201861-5-451-462.
Review
For citations:
Kulakov G.T., Kulakov A.T., Artsiomenka K.I. Parametric Optimization for Automatic Control System of Power Units of 300 MW for the Mode of Variable Pressure of Turbine Inlet Steam. ENERGETIKA. Proceedings of CIS higher education institutions and power engineering associations. 2018;61(6):539-551. (In Russ.) https://doi.org/10.21122/1029-7448-2018-61-6-539-551